Welcome To China Sinch Machinery.

+86 19903916940 monica@sinch.ltd

Slipform Curb Machine

Product Name Curbing machine
Model No. LSD-GAS
Power Diesel engine 15HP
Suitable material Aspalt,concrete
Max curb size 35*35cm
Min curb size 12*10cm
Working speed 2-3m/min
Hopper volume 0.2CBM
Weight  530KG
Dimension 1.8*1.1*1.2m
SEND INQUIRY

You can make an inquiry about this product.
Your e-mail will not be leaked.

  • PRODUCT DETAIL

Slipform Curb Paving Machine is also known as curb forming machine or curb molding machine.Pouring mixed concrete into hopper,through the auger blades extrude to mold part,then forming a continuous curb.

Below gasoline type concrete curb machine adpots gasoline engine instead of diesel power,makes the curb paver less weight and more quiet.

Slipform curb paving machine
Slipform curb paving machine

The auger hose and auger blades can be customized according to your curb size, bigger curb will need bigger blades.Normally, there are 4 blades in the auger house.The last one is seperate from others,if the last blade wore out.You can replace one blade,no need to waste the full auger.5-6 km will need to replace a blade.

curb machine auger blade
Curb machine auger blade

The mold is cusomized and can be remove from the curb body freely.You can change different molds according to your curb shape and size.

The hydraulic lift part is using for lift and down the curb body by 2 red handles. No need to adjust 4 hand screws one by one.

Curb machine molds
Curb machine molds can be customize

Before delivery,we will test each machine to make sure each part works properly.Put tool box and other spare parts into the hopper. They rapper by plastic film.

Curb machine packing
Curb machine packing for domastic order

For export orders, we will arrange export plywood case,it is free of fumigation.Before delivery,please advise your shipping mark and other shipping details.

Curb machine packing
Curb machine packing for export order
customized curb
Customized curb show
curb working site
Concrete and asphalt curb working site show
curb machine
Concrete and asphalt curb working site show

Production time: 2-3 days after paid.

Payment terms: 30% T/T before production,70% T/T before delivery.

Trade terms: FOB SHANGHAI,CIF,CFR,CNF.

Warranty: 12 months without wearing parts.

FOLLOW US